Bài giảng Lean production systems - Chapter 3: Lean flow - Nguyễn Như Phong

8/13/2018  
LEAN FLOW  
GVC. ThS. Nguyễn Như Phong  
Kỹ thuật Hệ thống Công nghiệp  
ĐH BÁCH KHOA – ĐHQG TPHCM  
(Tài liệu giảng dạy cho ISE)  
2018  
LEAN FLOW  
Takt Time  
Activity Time  
5S  
Visual Management  
Changeover Reduction  
TPM  
Standard Work  
Small machines  
Demand Smoothing  
11 April 2003  
Nguyeãn Nhö Phong  
1
8/13/2018  
LEAN FLOW  
Preparing 4 Lean Flow  
The foundation 4 fast, flexible flow  
Takt Time  
Activity Time  
5S  
Visual Management  
Changeover Reduction  
TPM  
Standard Work  
Small machines  
Demand Smoothing  
11 April 2003  
Nguyeãn Nhö Phong  
LEAN FLOW  
Takt Time & Activity Time –  
basic building block 4 lean flow  
5S  
The housekeeping  
Closely related 2 the TPM methodology  
Visual Management  
Enabled by 5S  
Make TPM & Standard Work more effective  
11 April 2003  
Nguyeãn Nhö Phong  
2
8/13/2018  
LEAN FLOW  
5S, Standard Work & TPM  
the basic 4 fast, consistent Changeover Reduction  
Demand Smoothing & Small machines  
Allow the other 2 be more effective  
Combination – an effective attack on 3M  
Muda (waste)  
Muri (difficult work)  
Mura (unevenness)  
11 April 2003  
Nguyeãn Nhö Phong  
TAKT TIME  
Fundamental concept  
Regular, uniform rate of progression of products  
through all stages from RM 2 cust.  
The drumbeat cycle of the rate of prod. flow  
Fundamental 2 flow & mapping of L operation  
11 April 2003  
Nguyeãn Nhö Phong  
3
8/13/2018  
Takt Time  
Available work time (/d) / average demand (/d)  
Available time:  
Actual time – planned stoppages  
Maintenance,  
team briefings,  
breaks  
Demand: average sales rate  
Spare parts, extra, anticipated scrap  
11 April 2003  
Nguyeãn Nhö Phong  
Takt Time  
Demand changes,  
Maintain the same TT  
by adjusting the available work time  
Multiple parts  
Demand – the total no. parts  
11 April 2003  
Nguyeãn Nhö Phong  
4
8/13/2018  
Takt Time  
Seasonal / variable demand  
Important selection of the period of estimated demand  
Longer period  
Build 2 order  
11 April 2003  
Nguyeãn Nhö Phong  
Takt Time  
Longer period  
Stabilize build rate  
More supermarket 2 smooth out the bumps  
Build 2 order  
Reducing the time horizontal  
More frequent TT  
Lines rebalanced, operators involved  
More lean & flexible  
11 April 2003  
Nguyeãn Nhö Phong  
5
8/13/2018  
Takt Time  
Not cycle time  
CT > TT constraint  
Parallel proc / additional shift  
Several TTs  
Parallel proc  
Eg. No. parts per prod  
Several TTs in a plant  
Overall synchronization  
11 April 2003  
Nguyeãn Nhö Phong  
PITCH TIME  
Pitch  
TT * C  
Container quantity / convenient multiple of parts  
15 – 30 m  
The time  
required 2 fill the standard container  
11 April 2003  
Nguyeãn Nhö Phong  
6
8/13/2018  
Pitch Time  
The pitch increment  
Basic time slot used in Heijunka sys.  
Material hander fit in the pitch time  
Vital sys. drumbeat  
forcing regularity, visibility & flow  
11 April 2003  
Nguyeãn Nhö Phong  
ACTIVITY TIMING & WORK ELEMENTS  
The IE / time & motion study task  
determining the duration of work elements  
Essential input  
Cell balance boards  
VS maps  
Scheduling  
Costing  
Best done by operators rather than IEs  
Sort out & standardize the motions before timing them  
11 April 2003  
Nguyeãn Nhö Phong  
7
8/13/2018  
Activity Timing & Work Elements  
Video making better than live recording  
Back tracking & avoid the stress  
At least 10 cycles / s  
Variation bw. operators  
Standard work  
11 April 2003  
Nguyeãn Nhö Phong  
Activity Timing & Work Elements  
Method  
Break down work sequence into work elements  
Record manual, walk, wait machine times in  
separate columns  
Make a list of activities  
Some manual times – NVA / NVAU  
Cell balancing  
Reduce / eliminate wait & walk times  
Reduce NVA / NVAU steps  
11 April 2003  
Nguyeãn Nhö Phong  
8
8/13/2018  
Activity Timing & Work Elements  
At least 10 good cycles  
Nothing goes wrong  
Discard outliers  
Nearest whole sec  
Lowest more frequently occurring time  
Not add allowance 4 PR&D –  
personal, rest, delay.  
More frequent breaks  
11 April 2003  
Nguyeãn Nhö Phong  
5S  
The basic housekeeping for lean, quality &  
safety  
Apply in office & SF equally  
Working better & feeling better in tidy room.  
Mindset  
Not be done by outsider  
11 April 2003  
Nguyeãn Nhö Phong  
9
8/13/2018  
5S  
Sort  
Simplify / Set in order / Straighten  
Sweep / Shine / Scrup  
Standardize / Stabilize  
Sustain / Self discipline  
11 April 2003  
Nguyeãn Nhö Phong  
5S  
Sort  
Throw out what not used  
Classify everything by frequency  
Do w. the team  
Touch item systematically  
Done regularly  
11 April 2003  
Nguyeãn Nhö Phong  
10  
8/13/2018  
5S  
Simplify / Set in order / Straighten  
Locate what used in the best place  
A place 4 everything  
Everything in its place  
Spaghetti diagram  
Ergonomic principles & audit  
11 April 2003  
Nguyeãn Nhö Phong  
5S  
Sweep / Shine / Scrub  
Keep up the good work  
Physical tidy up on an ongoing basis  
Visual sweeping  
Who response 4 what  
What standard  
Cleaning is checking  
11 April 2003  
Nguyeãn Nhö Phong  
11  
8/13/2018  
5S  
Standardize / Stabilize  
Standard work  
Bottom line 4 5S  
5S standards maintained  
Standard 4 3S  
11 April 2003  
Nguyeãn Nhö Phong  
5S  
Sustain / Self discipline  
5S ongoing basis  
Participation & improvement  
Audits regularly  
Award 4 achievement  
11 April 2003  
Nguyeãn Nhö Phong  
12  
8/13/2018  
5S  
6S = 5S + Safety  
An aspect of each 5S  
Safety procedure & standard developed,  
maintained & audited  
Unsafe conditions integral to 5S  
11 April 2003  
Nguyeãn Nhö Phong  
5S  
CANDO  
Cleanup  
Arrange  
Neatness  
Discipline  
Ongoing improvement  
11 April 2003  
Nguyeãn Nhö Phong  
13  
8/13/2018  
5S  
In fact doing 2S sporadically  
Waste  
Increasing effort 2 re-energize  
Real productivity & quality benefit on S4, 5  
5S audit & scoring sys  
11 April 2003  
Nguyeãn Nhö Phong  
STANDARD WORK  
Deming  
Improvement – moving from standard 2 standard  
Juran  
Holding the gains  
by establishing standards following improvement  
Standard Work a pillar of the TPS  
11 April 2003  
Nguyeãn Nhö Phong  
14  
8/13/2018  
Standard Work  
Ohno  
Achievement of standardized work  
w. min variance  
essential ingredient  
to allow OPF & JIT production  
11 April 2003  
Nguyeãn Nhö Phong  
Standard Work  
Henry Ford  
Standardize a method –  
choose out of many methods the best one & use it  
Today standardization –  
the foundation 4 tomorrow improvement  
11 April 2003  
Nguyeãn Nhö Phong  
15  
8/13/2018  
Standard Work  
Peter Wickens  
Standard operations – the property of  
Western – management / eng. Department  
Japan – people doing the job  
Prepare, do, improve  
Contrary to Taylor  
Combine thinking & doing  
High level of involvement & commitment  
11 April 2003  
Nguyeãn Nhö Phong  
Standard Work  
Standard & Davies –  
3 key aspects of SW  
Not static,  
updated procedure when better way found  
Support stability & reduce variation  
easily recognized  
Essential for continuous improvement –  
better standard  
11 April 2003  
Nguyeãn Nhö Phong  
16  
8/13/2018  
Standard Work  
Cover 3 aspects  
Work time –  
Both TT & CT recorded  
Work sequence  
Standard WIP  
11 April 2003  
Nguyeãn Nhö Phong  
Standard Work  
Moden 5 steps SOP development  
1.  
Determine the TT  
2.  
Determine the production capacity  
Net work time / ( proc time + CO)  
3.  
4.  
5.  
Determine the NOO  
Sum of work element / TT  
Define the standard procedure  
First remove waste, develop layout, standard location  
Write the SOP chart  
11 April 2003  
Nguyeãn Nhö Phong  
17  
8/13/2018  
Standard Work  
SOP  
contains  
TT  
Detailed work sequence steps  
w. time taken for each step  
Standard inventory quantity / kanban quantity  
Color coded to match the product  
Keeping up to date & in the work place  
11 April 2003  
Nguyeãn Nhö Phong  
Standard Work  
3 forms  
The SW combination chart  
Gantt chart – sequence of step against time bar  
The SW analysis chart  
Cell view showing standard route  
The SW element sheet  
Steps, time & photograph  
11 April 2003  
Nguyeãn Nhö Phong  
18  
8/13/2018  
Standard Work  
Yamazumi board  
Cellular manu established / TT change  
Operators rebalance the line  
change work standards to the new TT  
11 April 2003  
Nguyeãn Nhö Phong  
Standard Work  
Robert Hall 3-stages standardization  
Outcome only  
Standard established in a plan / drawing  
High level of variation  
Standardized processes  
Variance reduced by standardized methods  
Supported by eg. SPC, pokayoke  
Standardized predictive methods  
High level of consistency achieved  
Using standardized processes  
11 April 2003  
Nguyeãn Nhö Phong  
19  
8/13/2018  
TOTAL PRODUCTIVE MAINTENANCE -  
TPM  
Integral to lean  
No lean implementation success  
w. high breakdown level  
11 April 2003  
Nguyeãn Nhö Phong  
Total Productive Maintenance - TPM  
TPM  
Beyond breakdown issues  
Cover  
availability,  
performance,  
quality,  
safety,  
capital investment  
Making best use & extending the life of equipment  
11 April 2003  
Nguyeãn Nhö Phong  
20  
Tải về để xem bản đầy đủ
pdf 42 trang myanh 19020 Free
Bạn đang xem 20 trang mẫu của tài liệu "Bài giảng Lean production systems - Chapter 3: Lean flow - Nguyễn Như Phong", để tải tài liệu gốc về máy hãy click vào nút Download ở trên

File đính kèm:

  • pdfbai_giang_lean_production_systems_chapter_3_lean_flow_nguyen.pdf