LEAN LAYOUT
Plant layout
Lean plan layout
Cell
Line
Buffer & Supermarket
Paper Kaizen
Ergonomics
11 April 2003
Nguyeãn Nhö Phong
1
8/13/2018
PLANT LAYOUT
Basic / traditional pLayout
Fixed position layout
Not-fixed position layout
Process-oriented / Function layout
Product-oriented layout
11 April 2003
Nguyeãn Nhö Phong
Plant layout
Arrangement of physical plant facilities
Fixed-position layout
Product moving layout
Process layout
Product-flow layout
Cell layout
11 April 2003
Nguyeãn Nhö Phong
2
8/13/2018
Plant layout
Fixed-position layout
Product remain in one location,
because of size & weight
Equipment & material used brought to it
Project layout
Associated w. JS
Complex products fabricated in very low
quantities
11 April 2003
Nguyeãn Nhö Phong
Plant layout
Process layout
Machines arranged into groups
according to general type of manu proc.
Flexible advantage
Different parts
Unique sequence of operations
Routed through the respective departments
JS & BP
11 April 2003
Nguyeãn Nhö Phong
3
8/13/2018
Plant layout
Product-flow layout
One product / class of product in large volume
Complex assembled
Long sequence of operations
Facilities arranged efficiently
Inflexible arrangement
11 April 2003
Nguyeãn Nhö Phong
Plant layout
Cell layout
GT layout
Combine
the efficiency of product-flow layout
the flexibility of process layout
11 April 2003
Nguyeãn Nhö Phong
4
8/13/2018
LEAN PLANT LAYOUT
The plant builds in waste 4 many years
Schonberger
green field length/breadth ratio = 60:40
for flexibility & flow
Opportunity to question the VS map & inter-
facility spaghetti diagram
11 April 2003
Nguyeãn Nhö Phong
Lean plant layout
Avoid too-big & unfocused plant
Max 400 people
Several smaller focused plants,
each severving a particular cust.
Small focused self-contained factories
Own order entry,
production control,
dispatching,
meeting areas
11 April 2003
Nguyeãn Nhö Phong
5
8/13/2018
Lean plant layout
Supplier on site
Overall flow from one end 2 the other
no backtracking
multiple access points
multiple loading docks
max the no. ext. doors
11 April 2003
Nguyeãn Nhö Phong
Lean plant layout
Central MH spine 4 some operations
Grouping of inventory into supermarket
Break up the VS map into pull segment / loops
Avoid 2 big warehouse
Establish a series of specific water-spider routes
11 April 2003
Nguyeãn Nhö Phong
6
8/13/2018
Lean plant layout
Avoid long line & conveyors.
Use compact cells
Think 3D
Not get hooked on using old facilities.
Better 2 demolish & move
11 April 2003
Nguyeãn Nhö Phong
Lean plant layout
Locate design & engineering areas
close 2 manufacturing
Locate the PC in the middle of the plant floor
Foster communication & visibility
by open layout
11 April 2003
Nguyeãn Nhö Phong
7
8/13/2018
Lean plan layout design
Product family identification
Break the plant into lines & cells
Determine
what products
made in each cell / line
Line
Used 4 a class of products
Not 4 mixed products
11 April 2003
Nguyeãn Nhö Phong
Lean plan layout design
VS mapping
Gain the picture of the overall flow
VS broken up into stages / sub-cells
Important in case of shared resources /
convergent operations
Capacity need 2 be checked
Dedicated resources considered
11 April 2003
Nguyeãn Nhö Phong
8
8/13/2018
Lean plan layout design
Strategic issues considered
What cell objectives
Efficiency – min cost
Reduced leadtime
Flexibility
Combination
Rajan Suri 2 approaches
Technical – calculations & waste elimination
Managerial – understanding market &
competitive advantage
11 April 2003
Nguyeãn Nhö Phong
Lean plan layout design
The length of the line / cell
depends on inter-station buffer inventory.
One product nil desirable
Mixed model
Variable times & variation in mix
Some inventory kept in buffer location
11 April 2003
Nguyeãn Nhö Phong
9
8/13/2018
Lean plan layout design
Activity timings & sampling
Side-by-side activities
Separate m/c jobs/time from operator tasks/time
Operator – several m/c
Operator idle when m/c run – waste
Timings taken 4 each work element
11 April 2003
Nguyeãn Nhö Phong
Lean plan layout design
Activity timings & sampling
Work element first studied & broken down into
VA,
NVA,
NVAU
Video at least 10 observation
Take actual times, no allowance 4 rest & delay
Min 200 observations at random intervals
11 April 2003
Nguyeãn Nhö Phong
10
8/13/2018
Lean plan layout design
Optimal / theoretical operations
Combine the paper kazen w. activity sample
Sum of the corrected VA & NVAU times
Theoretical min times.
11 April 2003
Nguyeãn Nhö Phong
Lean plan layout design
Takt time
Weighted takt time 4 multiple product
Projected TT on future vol
Cell CT slightly below TT, eg. 95%
Used 4 balance
Allow 4 variation
11 April 2003
Nguyeãn Nhö Phong
11
8/13/2018
Lean plan layout design
Min no. operator
Theoretical min times / TT
>.25 Round up
<.25 Round down –
allow 4 the learning effect
11 April 2003
Nguyeãn Nhö Phong
Lean plan layout design
Balance the work bw. the operator against cell CT
Allocating the timed work elements
bw. operators against the target TT
Some task inherently more difficult / variable
More allowance given
11 April 2003
Nguyeãn Nhö Phong
12
8/13/2018
Lean plan layout design
Balance the work
bw. the operator against cell CT
3 assembly station categories
Red – highly trained operator
Blue – mid range skills
Green – basic skills
+&-1 balance exercise
Cell balance 4 one more/less operator
TT change, adjustment made at short notice
Cell run w. reduced/additional time 2 gain the same output
11 April 2003
Nguyeãn Nhö Phong
Lean plan layout design
Detailed w/s layout & ergonomics finalized
Operator –
Stand not sit,
except 4 accurate work & hand assembly
Max visibility, safety & communication
Avoid the need 2 bend / reach
11 April 2003
Nguyeãn Nhö Phong
13
8/13/2018
Lean plan layout design
Detailed w/s layout & ergonomics finalized
Automation
Not anti but cautious
Quality, ‘dull-dirty-dangerous’, hot heavy
hazardous
Not save people
Lock in waste
Not feasible
11 April 2003
Nguyeãn Nhö Phong
Lean plan layout design
Standard work charts
Cell operators working in conjunction w. IEs
Work combination charts
Gantt type charts
Sequence of activities & times
11 April 2003
Nguyeãn Nhö Phong
14
8/13/2018
Lean plan layout design
Standard work charts
Cell layout charts
Cell geography / plan view
Operator routes
Moving back & forth
Walk around in a circle
More waits but less movement
Inventory location & quantities
11 April 2003
Nguyeãn Nhö Phong
Lean plan layout design
Pull sys / Heijunka
Regulate the cell flow
Mixed model, pitch, runner considerations
Runner
Card board sim.
important cell
Fine tuning & operator buy in
Simulate the cell full scale operations
11 April 2003
Nguyeãn Nhö Phong
15
8/13/2018
CELL
Wider organizational arrangement
Cell as self contained as pos.
11 April 2003
Nguyeãn Nhö Phong
Cell
Balancing mixed model lines
Line balance board
TT established
Target CT
Set below TT
Allow 4 general operator variation
Operator target time
Individual station time
Relative complexity & uncertainty at each w/s
11 April 2003
Nguyeãn Nhö Phong
16
8/13/2018
Cell
Balancing mixed model lines
Green zone
Common elements assemble
Done 4 every product
Variable 4 each w/s
Zone limit approximate
Red zone
Work elements unique 2 each prod. Accumulated
Total prod assembly time can exceed the OTT
Weighted average time not exceed
11 April 2003
Nguyeãn Nhö Phong
Cell
Plant layout & supermarkets form the skeleton 4 cells
Supermakets remain in place 4 longer
Carrying RM in multiple locations around –
bad idea
Material hander establish the rhythm of delivery
The basic cell layout considered
U shape
Line
S shape.
11 April 2003
Nguyeãn Nhö Phong
17
8/13/2018
Cell
Cell operators not have 2 fetch & & deliver part used
Waste activity grouped together
Single runner working bw. several cells & supermarket.
Operator working directions & allocations
Working in the same /opposite direction as prod. flow
2/more operator
1 operator in the first & last operations of U cell
11 April 2003
Nguyeãn Nhö Phong
Cell
Check 4 constrains / bottlenecks
CT near 2 / exceed TT
In-cell activity exceeding takt need
Additional shift
Before & after buffer
Tight constraint
Run near continuously
Avoid having 2 run 4 an additional shift
11 April 2003
Nguyeãn Nhö Phong
18
8/13/2018
Cell
Check 4 constrains / bottlenecks
CT near 2 / exceed TT
Resource
Protected by a time buffer (x hours of stock)
Prioritized 2 ensure continuous operation
DBR arrangement
Work fed into the cell at the rate in accordance w. the
bottleneck
11 April 2003
Nguyeãn Nhö Phong
Cell
Check 4 constrains / bottlenecks
Off line activity
Exit & entry buffer
OPF before & after the stage – one at a time
Feeding into the outbound buffer
Withdrawing from the inbound buffer
11 April 2003
Nguyeãn Nhö Phong
19
8/13/2018
Cell
Reference cost 4 a week
Operator & inventory savings
Space & quality savings
Wake up call 2 management
11 April 2003
Nguyeãn Nhö Phong
Cell
Cell layout - Detailed re-layout
M/c access
Design as if one operator run the cell
Gravity feeds
Mat runner
Deliver all parts 2 the cell & Remove complete products
Work regular, standard circuits.
11 April 2003
Nguyeãn Nhö Phong
20
Tải về để xem bản đầy đủ
Bạn đang xem 20 trang mẫu của tài liệu "Bài giảng Lean production systems - Chapter 4: Lean layout - Nguyễn Như Phong", để tải tài liệu gốc về máy hãy click vào nút Download ở trên
File đính kèm:
bai_giang_lean_production_systems_chapter_4_lean_layout_nguy.pdf