Bài giảng Lean production systems - Chapter 10: Kaizen plans - Nguyễn Như Phong
8/13/2018
KAIZEN PLANS
GVC. ThS. Nguyễn Như Phong
Kỹ thuật Hệ thống Công nghiệp
ĐH BÁCH KHOA – ĐHQG TPHCM
(Tài liệu giảng dạy cho ISE)
2018
KAIZEN PLANS
Create Kaizen plans
VS Kaizen stages
Planning recap
Prepare for implementation
Implement Kaizen Plans
Recommendation 4 coping w. change
Keep the big picture in mind
Wrap up
Nguyễn Như Phong
11 April 2003
1
8/13/2018
Create Kaizen Plans
Create detailed plan
guide efforts 2 improve the VS
wo. solid planning
slim chances 4 successful lean transformation
Nguyễn Như Phong
11 April 2003
Create Kaizen Plans
Schedule recurring meeting 2 ensure
Communication flows
All involved parties remain on the same pace
VS project status
In partnership w. VS champion
As milestone attained
Tools 4 highlighting concerns & potential solutions
Nguyễn Như Phong
11 April 2003
2
8/13/2018
Create Kaizen Plans
Comprehensive planning
very important
but plans
not perfect
modified as
proceed through implementation
gain more practical experience w. L manu methods
Nguyễn Như Phong
11 April 2003
VS Project status: June 30
Schedule
Target completion date of 30/12
Accomplishments
Draft charter
Conducted training class on VSM
Modify PF 2 A & B only
ThS Nguyễn Như Phong
11 April 2003
3
8/13/2018
VS Project status: June 30
Concerns (Issues)
Ability 2 maintain meetings at 3pm
Utilize a more planning tool 2 schedule improvement
Plan
Schedule meeting 4 1pm
Team leader 2 utilize KMW
4 detailed implementation of DFL focused kaizens
ThS Nguyễn Như Phong
11 April 2003
VS Kaizen stages
The monthly kaizen plan
Milestones:
Break the plan into manageable pieces
Complete the VSM storyboard
Catchball
Nguyễn Như Phong
11 April 2003
4
8/13/2018
VS Kaizen stages
To increase the chances of success,
plan the implementation using the stages:
Plan how 2 ensure 2 meet CD
Plan how 2 improve the process flow
Plan how 2 level production
Planning sequence
most effectively & least costly
implementation of K plans
Nguyễn Như Phong
11 April 2003
VS Kaizen stages
K planning process steps
1. Review FSM
create a MKP
2. Determine milestones 4 each major K activity
create KMC
3. Complete VSM storyboard
4. Obtain management approval
for KPs through catchball
Nguyễn Như Phong
11 April 2003
5
8/13/2018
The monthly kaizen plan
Plotting the implementation schedule
for the main elements / events
accomplished in each stage of FSM
Symbols 2 plot the timeframes
Open triangles – start dates
Dashed lines – expected duration
Closed triangles – completion dates
Macro-level sequence 4 implementation
MKP worksheet
Nguyễn Như Phong
11 April 2003
MKP worksheet
VS:
Date:
Schedule
Stage Event
J
F
M
A
M
J
Nguyễn Như Phong
11 April 2003
6
8/13/2018
Milestones:
Break the plan into manageable pieces
Overall structure
for the main improvement events in place
Create a series of specific milestones for each event
Nguyễn Như Phong
11 April 2003
Milestones:
Break the plan into manageable pieces
Milestones
definable activities / tasks
required 2 accomplish the improvement
assigned completion dates
Eg.
Create a staging area in shipping
Install gravity racks at all supermarket locations
Establish production based on pitch
Nguyễn Như Phong
11 April 2003
7
8/13/2018
Milestones:
Break the plan into manageable pieces
Kaizen milestone chart – KMC
Document & tract the completion of milestone
Show the sequence of
implementation activities
completion over time
Get down 2 next level of detail
Monitor activities on an ongoing basis
track progress toward completion
Nguyễn Như Phong
11 April 2003
Milestones:
Break the plan into manageable pieces
Things not always go according 2 plan
milestone achieved
earlier than planned
later than planned
Nguyễn Như Phong
11 April 2003
8
8/13/2018
KMC
VS:
VS members:
June
Date: 15/9
July
Item
Task
Assìgn to
1
2
3
4
1
2
3
4
Demand
FGS
S
S
S
---
---
---
C
BS location
SS location
BS AMT
C
C
---
SS AMT
C
Ship Stage Area
C
Nguyễn Như Phong
11 April 2003
KMC
VS:
VS members:
Assìgn to June
Date: 15/9
July
Item
Task
1
2
3
4
1
2
3
4
Flow
Machning supermarket
Line balance
S
C
S
---
C
Gravity racks
S
---
S
C
---
---
Kanban address
Restricted FIFO lane
Standardized work
Quick CO assembly
Pitch establish
---
---
S
---
---
S
C
C
C
C
---
S
---
S
---
S
---
Machining programming
---
C
Nguyễn Như Phong
11 April 2003
9
8/13/2018
KMC
VS:
VS members:
August
Date: 15/9
September
Item
Task
Assìgn to
1
2
3
4
1
2
3
4
Leveling
Heijunka box
Runner route
Team Recognition
S
S
---
---
---
C
C
All
C
Nguyễn Như Phong
11 April 2003
Complete the VSM storyboard
Time 2 complete the VSM storyboard
Add
Proposed monthly Kaizen plan
Any other data overlooked earlier
Nguyễn Như Phong
11 April 2003
10
8/13/2018
PM CASE
Kaizen proposal
2001
1st 2nd 3rd 4th
Demand- Establish BSS, FGS, implement 5S
S
S
C
C
S
S
S
Flow – Cell design. Line balancing. Standardized work
Flow – Reduce CO. implement AM
Level – establish runner route
C
Level – Implement Heijunka & kanban sys
C
Level – Additional TPM application: modify PM standards
Started - Complete - Past Due
Nguyễn Như Phong
11 April 2003
Catchball
Time 2
play catchball
get buy-in 4 the plans
Presenting the plan 2 high-level managers
gain approval 4 the plan
Smooth Catchball process
The FS planned carefully
Careful thought to
how the plan implemented systematically
Nguyễn Như Phong
11 April 2003
11
8/13/2018
Catchball
Prepare 4 the UM meeting
Why implementing lean in this VS
What impact on customers
What quality improvement achieved
What cost saving achieved
What LT reduction achieved
How relate 2 strategic objectives
Nguyễn Như Phong
11 April 2003
Planning recap
Planning primarily about managing action
Guidelines 4 effective K planning
Be realistic
Play catchball
Be detailed
Communicate
Make it visual
Recognize good work
Be sure 2 celebrate
Nguyễn Như Phong
11 April 2003
12
8/13/2018
Prepare for implementation
Plan carefully – minor adjustment 2 the plans
Make whatever modification required
then prepare 4 the implementation
Various members of the implementation team
lead a series of K events
make the changes necessary 2 transform the VS
Nguyễn Như Phong
11 April 2003
Prepare for implementation
K events
A team event
dedicated 2 quick implementation of L manu method
in a particular area
over a short time period
Nguyễn Như Phong
11 April 2003
13
8/13/2018
Prepare for implementation
Main points of preparing K events
Identify clearly & communicate the E objectives
Identify any training
Define the scope
Register the team by team charter
Use the KMC 2 determine event completion date
Prevent problems
Draft the agenda 4 the duration of the event
Nguyễn Như Phong
11 April 2003
PM CASE
Implementation agenda
VS: A&B
VS Stage: Demand
Event date: May 17-18
Kaizen event objective: Estabish a FGS sys
Nguyễn Như Phong
11 April 2003
14
8/13/2018
PM CASE
Implementation agenda
Day 1
Welcome & intro
Review VSM storyboard
Adjust any parts of the demand FS
Identify any issues
Walk the actual flow as defined in the FS
Conduct training on supermarket & kanbans
Begin analysis of kanban flow & conduct kanban calculation
Nguyễn Như Phong
11 April 2003
PM CASE
Implementation agenda
Day 2
Begin setting up stores
Create KCs
Set up address locations 4 the supermarket
Determine list & color code sys 4 store
Trial K sys
Collect data & monitor
Review data
Write initial supermarket & kanban procedure
Update job descriptions
Update internal procedures
Monitor
Set plan 2 standardize within 1w
Team recognition
Nguyễn Như Phong
11 April 2003
15
8/13/2018
Prepare for implementation
Team recognition
Transform a VS 2 its FS
may take a year or longer
People
work long periods wo. feeling appreciated
bound 2 loose focus & enthusiasm
Nguyễn Như Phong
11 April 2003
Implement Kaizen Plans
Planning & preparation done
Proceed 2 the implementation phase
Enthusiasm & confidence
Kaizen activities
When implementation begins in earnest
impact on virtually everyone connected 2 the VS
Nguyễn Như Phong
11 April 2003
16
8/13/2018
Recommendation 4 coping w. change
Change
even 4 better
difficult 4 most people
The more people know about what going on
the easier 2 deal w. anxieties
accompanying significant change
Nguyễn Như Phong
11 April 2003
Recommendation 4 coping w. change
Communicate
Address negative behavior early in the implementation
Not let the problem stop the process
Consider each kaizen event an experiment
Nguyễn Như Phong
11 April 2003
17
8/13/2018
Recommendation 4 coping w. change
Reward & recognize people’s efforts
practice mutual trust & respect
treat people w. honesty & integrity every day
Be present
Be flexible
Nguyễn Như Phong
11 April 2003
Keep the big picture in mind
Keep the big picture in mind as progress
Refer 2 the storyboard frequently
2 explain 2 people how using VSM process
Fast, flexible process
Be patient & realistic
Nguyễn Như Phong
11 April 2003
18
8/13/2018
Wrap up
Continually to look for ways
to improve the entire VS
Nguyễn Như Phong
11 April 2003
19