MAP THE FUTURE STATE  
Lean application stages  
Demand  
Flow  
Leveling  
Map the FS  
Begin the FSM  
Focus on demand  
Focus on flow  
Focus on leveling  
Why maintaining takt image matters  
FSM Wrap up  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
1
8/13/2018  
Lean application stages  
Lean concepts grouped into 3 stages  
Demand  
Flow  
Leveling  
Tools, techniques within each stage  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Lean application stages  
Implement stages in the same order  
Understand the stages of application  
Along w. the guideline 4 implementing VSM  
Give solid approach  
Not only 4 implementing  
But also 4 sustaining lean improving  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
2
8/13/2018  
Lean application stages  
The common principles / goals  
Stabilize processes  
Reviewing  
cust demand,  
equipment capabilities  
Labor balance,  
Material flow  
Standardize processes  
Simplify through kaizen  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Lean application stages  
Demand  
Understanding C demand  
Including Q characteristics, LT, price  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
3
8/13/2018  
Lean application stages  
Flow  
Implementing continuous flow manu  
Inex cust receive  
right prod  
at the right time  
in the right quantity  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Lean application stages  
Leveling  
Distributing work evenly  
By volume & variety  
To  
Reduce inventory  
Allow smaller orders by the cust.  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
4
8/13/2018  
Understand cust. ordering patterns  
What need 2 produce  
Specifically in terms of quantity & delivery requirement.  
Actual no. parts need 2 produce each day.  
Understand cust. ordering patterns  
Info sources  
Sale forecasts  
Previous 3m’s production  
Current production forecasts  
Long-term agreement  
Cust. interview  
What producing last & this week  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Understand cust. ordering patterns  
2 opposite attitudes toward C demand  
There is no tomorrow !  
There is always tomorrow !  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
5
8/13/2018  
Understand cust. ordering patterns  
No tomorrow !  
Meeting C demand takes more than just applying the  
appropriate tools  
Only today 2 meet C’s expectations  
Always tomorrow !  
Prevail in many org.  
Can get most of it done today & finishing it tomorrow  
Achieving no better than 90% on time delivery  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Demand  
Tools & concepts  
for determining & meeting demand  
Takt time  
Pitch  
Takt image  
Buffer & safety inventory  
FG market  
Lights-out manu.  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
6
8/13/2018  
Takt time  
Takt time  
The pace of C demand  
The rate at which  
A company must produce a product 2 satisfy C demand.  
Producing 2 takt  
Synchronizing the production pace w. the sales pace.  
Takt time = time / volume (s)  
Available production time  
Minus downtime: break, lunch, meeting, …  
Total daily quantity required  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Operational Takt time  
Operational Takt time  
Time faster than takt time  
Used 2 balanced the line 2 accommodate a chronic sys  
failure  
Equipment downtime  
Absenteeism  
Sudden C demand change  
Eg. 10% faster  
T = 60 s OTT = 54s  
Focus Kaizen activities 2 reduce sys problems  
Move toward the true C demand  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
7
8/13/2018  
Pitch  
The ideal state in any pull sys  
Eliminate all waste  
Create one-piece flow through the entire sys.  
Cust not order product one piece at a time  
But in a standard pack-out quantity  
Shipped in a container of some sort  
Convert takt time into pitch  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Pitch  
Pitch  
The amount of time based on takt  
Required 4 an upstream operation  
2 release a predetermine pack-out quantity of WIP  
2 a downstream operation  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
8
8/13/2018  
Pitch  
Pitch = takt time * pack-out quantity  
takt time – cust driven  
pack-out quantity – may not  
Eg: P = 1 m/p * 20 p/c = 20 m  
High volume, low variety line: P=12 – 30 m  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Pitch  
Calculating pitch – a compromise bw.  
Producing in large batches  
Implementing 1p flow  
Not always practical 2 produce 2 takt one piece at a time  
But possible 2 produce a small batch in pitch  
Eg. T = 0,5 s  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
9
8/13/2018  
Advantages of Pitch  
Advantages of Producing in small batches  
based on pitch  
A forklift less necessary  
Improved safety  
Improved I control  
Problems identified immediately  
Much-shorter-time reaction 2 a problem  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Takt image  
Visualize 1-p flow  
Strike for the ideal state of 1-p flow  
Takt image –  
The vision of the ideal state  
Eliminate waste  
Improve the VS performance  
Achieve OPF based on takt time  
Risk wo. a clear takt image  
Always tomorrow  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
10  
8/13/2018  
Buffer & safety inventory  
Make the commitment 2 meet the C demand  
Not confidently meet the C demand  
Buffer inventory  
Safety inventory  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Buffer & safety inventory  
Buffer inventory  
Used when C demand suddenly increases  
Production process not capable of meeting a lower/faster  
takt time  
Safety inventory  
Protect the sys from internal problems  
Labor power, equipment reliability, power outages  
quality problems, …  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
11  
8/13/2018  
Buffer & safety inventory  
Buffer inventory  
FG available 2 meet CD  
When C ordering patterns / takt time varies  
Safety inventory  
FG available 2 meet CD  
When internal constraints / inefficiencies disrupt process  
flow  
BSI  
Exist for 2 distinct reasons  
Stored & tracked separately  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Buffer & safety inventory  
Establishing BSI  
Meet demand  
wo. having to schedule overtime sporadically  
Compromise on the journey 2 ideal state  
Excess inventory – waste  
Minimize / eliminate BSI if possible  
CD become more stable  
Operation & process reliability improved  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
12  
8/13/2018  
FG supermarket  
Determine where CD met within the VS  
FG supermarket  
Items not replaced until removed by cust.  
A sys.  
Used in VS shipping part  
Store a FG set level  
Replenished as pulled 2 fulfill cust. Orders  
Used when not possible  
2 establish pure, continuous flow.  
Not include BSI  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Lights-out manu.  
Unattended manu  
A mean of meeting CD  
Automated machines run wo. operators  
Increase available production time,  
thus increase capacity  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
13  
8/13/2018  
Lights-out manu.  
Consider  
Determine PCR: 1.63 2  
Review type of material  
Review part complexity  
Determine the appropriate lot size  
Potential problems  
Operator reluctance  
Quality problem  
Inspection time  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Flow  
Once  
Stabilized demand  
Devised a sys 4 ensuring meeting it  
Establishing a flow  
2 ensure cust. receive right part, time, amount  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
14  
8/13/2018  
Flow  
Tools & concepts  
Continuous flow  
Work cells  
Line balancing  
Standardized work  
Quick changeover  
Autonomous maintenance  
WIP supermarket  
Kanban sys  
FIFO lanes  
Production scheduling  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Continuous flow  
Continuous flow  
Move one, make one  
Move 1 small lot, make one small lot  
JIT philosophy  
Never produce more than a cust. Requires  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
15  
8/13/2018  
Continuous flow  
Key principles  
Only what needed  
Just when needed  
Exact amount needed  
Pull sys  
One piece / small batch produced upstream  
Only after a piece / small batch moved / pulled downstream  
Faster than batch / push production  
Eliminate the need 4 traditional production scheduling  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Continuous flow  
CF advantages  
Shorter LT  
WIP reduction  
Ability 2 identify & fix problems earlier  
No traditional production scheduling  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
16  
8/13/2018  
Continuous flow  
Obstacles 2 CF  
Linking operations  
compound problems of each operation:  
LT  
Downtime  
CO  
Processes improved  
Poor plant layout  
Varying speed of processes  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Work cells  
Flow sys  
Items progress piece by piece / in small batch  
Equipment  
Not grouped by categories  
But in way  
Minimize transportation waste  
Sustain CF  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
17  
8/13/2018  
Work cells  
WC  
Achieve CF  
Self-contained unit include several VA operations  
Arrange equipment & personnel in process sequence  
Produce & transport parts one piece at a time  
Improved safety & reduced effort  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Work cells  
Cell layout planning principles  
Arrange processes sequentially  
Counterclockwise flow  
Machines close together  
Last operation close 2 the first  
U, C, L, S, V shape  
Adapt 2 C changing demand  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
18  
8/13/2018  
Line balancing  
Some operations  
take longer than others  
Operators waiting 4 the next part  
Need more than one operator  
Line balancing  
Evenly distribute the work elements within a VS  
to meet takt time  
Optimize the use of personnel  
Balance workload  
No one doing too little / too much  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Line balancing  
Rebalance a line  
CD fluctuate  
TT changed  
Cycle Time  
Elapse from beginning until completion of an  
operation  
Processing time  
Not TT  
Measure of CD  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
19  
8/13/2018  
Line balancing  
Total Cycle Time  
Total of the CTs 4 each individual operation in a VS  
Total VAT  
Operator Balance Chart  
Visual display  
Work element, time requirement, operator at each WS  
Show improvement opportunities  
CT,  
TT,  
TCT  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
Line balancing  
OBC steps  
Determine current CTs & work element assignment  
Create bar chart  
Determine the no. operators needed  
Proposed the balance chart  
By implementing standardized work  
GVC. ThS Nguyễn Như Phong  
11 April 2003  
20  
Tải về để xem bản đầy đủ
pdf 69 trang myanh 18200 Free
Bạn đang xem 20 trang mẫu của tài liệu "Bài giảng Lean production systems - Chapter 9: Map the future state - Nguyễn Như Phong", để tải tài liệu gốc về máy hãy click vào nút Download ở trên

File đính kèm:

  • pdfbai_giang_lean_production_systems_chapter_9_map_the_future_s.pdf