Bài giảng Lean production systems - Chapter 2: Lean thinking - Nguyễn Như Phong

8/13/2018  
LEAN THINKING  
GVC. ThS. Nguyễn Như Phong  
Kỹ thuật Hệ thống Công nghiệp  
ĐH BÁCH KHOA – ĐHQG TPHCM  
(Tài liệu giảng dạy cho ISE)  
2018  
Lean philosophy  
Fast flexible flow  
Lean principles  
Lean characteristics  
Value  
Waste  
Cost Reduction Principle  
Time based competition  
Gemba  
11 April 2003  
Nguyeãn Nhö Phong  
1
8/13/2018  
Fast, flexible flow  
The basic 4 lean in manu & service  
Combine them  
the best way 2 achieve huge productivity & quality gains  
simultaneously  
The exact opposite of batch & queue operations  
The lean vision or goal  
Waste prevention & variation reduction – principle means  
Breaking down barriers bw. traditional department  
11 April 2003  
Nguyeãn Nhö Phong  
Fast, flexible flow  
Fast  
Speed – at the heart of lean  
Taichi Ohno  
Removing NVA wastes 2 reduce the time line  
Think economic of time not economic of scale  
11 April 2003  
Nguyeãn Nhö Phong  
2
8/13/2018  
Fast, flexible flow  
Flexible  
The whole basic of TPS – low cost flexibility  
The ideal state of flexibility - A batch size of one  
Offer huge productivity gain from cust. view point  
The best provider policy  
11 April 2003  
Nguyeãn Nhö Phong  
Fast, flexible flow  
Flexible  
World condition 2 batches  
Manu – EPQ, EOQ  
Transportation – container  
Education – batch of students  
Holqueg types of flexibility  
Process flexibility  
Product flexibility  
Volume flexibility  
Labor flexibility  
11 April 2003  
Nguyeãn Nhö Phong  
3
8/13/2018  
Fast, flexible flow  
Flow  
Keep-it-moving operation brings waste 2 the surface  
Work steadily at the cust. rate  
not hurry up & wait as in batch & queue  
Concentrate on VA sec, ignore NVA hours  
Value added steadily  
Think takt time  
Manipulating demand & managing capacity  
Convert the JS 2 the cell / line  
Pull sys encourage flow 2 take place at the rate of demand  
11 April 2003  
Nguyeãn Nhö Phong  
Lean principles  
5 lean principles  
1. Value  
2. Value stream  
3. Flow  
4. Pull  
5. Perfection  
Not sequential, one off procedure  
a journey of continuous improvement  
11 April 2003  
Nguyeãn Nhö Phong  
4
8/13/2018  
Value  
Specify value from cust view point  
Established marketing idea  
Cust buy results, not product  
Manufacturer gives cust  
what convenient 4 the manufacturer  
deemed economic 4 the cust.  
11 April 2003  
Nguyeãn Nhö Phong  
Value  
New product design  
constrained by existing manu facilities  
rather than by cust requirement  
Who is the cust. ?  
11 April 2003  
Nguyeãn Nhö Phong  
5
8/13/2018  
Value stream  
Identify the VS  
The sequence of process all the way  
from RM 2 final cust  
from product concept 2 market launch  
11 April 2003  
Nguyeãn Nhö Phong  
Value stream  
Concentrate on the view point of object / prod / cust  
not on the view point of the department / process step  
Economies of time not of scales  
The VS should be mapped  
Focus horizontally, not vertically  
11 April 2003  
Nguyeãn Nhö Phong  
6
8/13/2018  
Flow  
Make value flow  
1 piece flow if possible  
Keep it moving  
Avoid batch & queue  
Continuously reduce B&Q & the obstacles  
11 April 2003  
Nguyeãn Nhö Phong  
Flow  
Stalk & Hout golden rule  
Never 2 delay a VA step by a NVA step  
Try 2 do such step in parallel  
Vision  
important  
guiding strategy move inexorably toward flow  
11 April 2003  
Nguyeãn Nhö Phong  
7
8/13/2018  
Pull  
Short term response 2 the cust’s demand rate  
not over producing  
2 level  
Macro level  
Micro level  
11 April 2003  
Nguyeãn Nhö Phong  
Pull  
Macro level  
Push up 2 a certain point then response 2 final cust pull  
signal  
Push the point further & further upstream  
Micro level  
Response 2 the pull signal from an internal cust  
Kanban – next process step  
DBR / CONWIP – important stage  
11 April 2003  
Nguyeãn Nhö Phong  
8
8/13/2018  
Perfection  
Not mean only quality  
Mean producing  
exactly what cust wants  
exactly when  
at a fair price  
w. min waste  
11 April 2003  
Nguyeãn Nhö Phong  
Perfection  
Beware of benchmarking  
Real benchmark  
Zero waste  
Not competitor doing  
11 April 2003  
Nguyeãn Nhö Phong  
9
8/13/2018  
LEAN CHARACTERISTICS  
1. Customer  
2. Simplicity  
3. Waste  
11. Time  
12. Improvement  
13. Partnership  
14. Value networks  
15. Gemba  
16. Variation reduction  
17. Participation  
18. Thinking small  
19. Trust  
4. Process  
5. Visibility  
6. Regularity  
7. Flow  
8. Pull  
9. Postponement  
10. Prevention  
20. Knowledge  
11 April 2003  
Nguyeãn Nhö Phong  
Customer  
The ext. cust. the starting & ending point  
Max value 2 the cust  
Optimize around the cust. not around internal  
operation  
Understand the true cust demand  
in price, delivery, quality  
not what can be supplied  
11 April 2003  
Nguyeãn Nhö Phong  
10  
8/13/2018  
Simplicity  
Simplicity pervade  
Goals  
Simplicity in operation, sys, technology, control  
Avoidance of complexity  
Simplicity  
Product –  
part count reduction & commonality  
Supplier –  
working closely w. few trusted partners  
Plant –  
focused factories within a factory  
11 April 2003  
Nguyeãn Nhö Phong  
Waste  
Endemic  
Recognize & seek 2 reduce it  
Everyone wear muda spectacles  
Seek 2 prevent waste  
by good design of prod & proc.  
11 April 2003  
Nguyeãn Nhö Phong  
11  
8/13/2018  
Process  
Organize & think by the process view  
Think horizontal not vertical  
Concentrate on product moves  
Map 2 understand the process  
11 April 2003  
Nguyeãn Nhö Phong  
Visibility  
Make all operations as visible & transparent as  
pos.  
Control by sight  
Adopt the visual factory  
11 April 2003  
Nguyeãn Nhö Phong  
12  
8/13/2018  
Regularity  
No-surprises operations  
Run plants on regularity  
Repeater product in the same time slots  
Cut inventory  
Improve quality  
Allow control simplicity  
11 April 2003  
Nguyeãn Nhö Phong  
Flow  
Keep it moving at the cust rate  
One piece flow  
Synchronize operations JIT stream  
Aim at cell level  
Synchronize info & physical flow  
Can’t flow  
Pull 1 at a time  
Small batches  
11 April 2003  
Nguyeãn Nhö Phong  
13  
8/13/2018  
Pull  
Work at the cust rate of demand  
Avoid overproduction  
Pull-based demand chain  
Not push-based supply chain  
Final cust demand  
Not distorted by intermediate bullwhip effect  
11 April 2003  
Nguyeãn Nhö Phong  
Postponement  
Delay activities & committing 2 product variety  
as late as pos  
to  
retain flexibility  
reduce waste & risk  
avoid overproduction  
11 April 2003  
Nguyeãn Nhö Phong  
14  
8/13/2018  
Prevention  
Prevent problems & waste  
rather than inspect & fix  
Inspect the proc. not the prod.  
Prevent error through pokayoke  
11 April 2003  
Nguyeãn Nhö Phong  
Time  
Time  
The best single overall measurement  
Reduce overall time 2  
make,  
deliver,  
introduce new prod.  
Simultaneous, parallel, overlap operations  
Never delay VA steps by NVA steps  
Time reduction priority  
Do all right things - waste, flow, pull, perfection  
11 April 2003  
Nguyeãn Nhö Phong  
15  
8/13/2018  
Improvement  
Continuous improvement  
both enforce & passive  
both incremental & breakthrough  
Beyond waste reduction  
Include innovation  
11 April 2003  
Nguyeãn Nhö Phong  
Partnership  
Cooperative working  
internally bw. functions  
externally w. sup & cust.  
Team, not individuals, inext  
Build trust  
Win-win  
11 April 2003  
Nguyeãn Nhö Phong  
16  
8/13/2018  
Value networks  
Cooperating networks  
the greatest opportunities 4  
Cost  
Quality  
Delivery  
Flexibility  
Supply chains compete, not companies  
Each member need 2 add value  
11 April 2003  
Nguyeãn Nhö Phong  
Gemba  
Go to where the action happening, seek the fact  
Manage by walking around  
On the floor not in the office  
Encourage gemba spirit  
11 April 2003  
Nguyeãn Nhö Phong  
17  
8/13/2018  
Variation reduction  
Variation in time & quantity  
found in every process  
great lean enemy  
Continually reduce it  
Manage it  
Measure it  
Know the limits  
Distinguish bw. natural variation & special events  
Build in appropriate flexibility  
Shock proof the sys  
11 April 2003  
Nguyeãn Nhö Phong  
Participation  
Operators – 1st opportunity 2 solve problems  
All employee share responsibility 4 success &  
failure  
Full info sharing  
11 April 2003  
Nguyeãn Nhö Phong  
18  
8/13/2018  
Thinking small  
Smallest capable machine then build capacity in  
increments  
Get best value out of existing m/c before  
acquiring a new one  
Flexible labor & machines  
Small plant near to cust site  
Many small deliveries rather than few big one  
11 April 2003  
Nguyeãn Nhö Phong  
Trust  
Buid trust  
participation &  
cutting waste  
Swathes of bureaucracy & time remove inexly.  
De-layered, streamlined, more creative organization  
Supplier  
Confidence 2  
make investment  
Share knowledge  
11 April 2003  
Nguyeãn Nhö Phong  
19  
8/13/2018  
Knowledge  
Knowledge worker the engine of today  
corporation  
Not only building but distributing knowledge  
Knowledge  
Explicit knowledge  
Tacit knowledge  
Softer / sticker skills  
Hard 2 copy  
Sustainable advandtage  
11 April 2003  
Nguyeãn Nhö Phong  
VALUE  
Lean principles  
First understanding value  
Second removing waste  
Value enhancement  
arguably more important than waste reduction  
especially in service  
Porter – value  
the amount buyer willing 2 pay 4 what a firm provides  
them  
measured by total revenue  
a reflection of the price  
11 April 2003  
Nguyeãn Nhö Phong  
20  
Tải về để xem bản đầy đủ
pdf 52 trang myanh 21600 Free
Bạn đang xem 20 trang mẫu của tài liệu "Bài giảng Lean production systems - Chapter 2: Lean thinking - Nguyễn Như Phong", để tải tài liệu gốc về máy hãy click vào nút Download ở trên

File đính kèm:

  • pdfbai_giang_lean_production_systems_chapter_2_lean_thinking_ng.pdf